Saturday, October 20, 2007

New Renovation To-Do list

Ok, first here's the old list, updated for clarification.

and here's the new list:

Kitchen:
- bevel the front edge of the window shelf above the sink to accommodate the faucet handle in the hot position
- install window-shelf behind sink
- caulk joints around sink area
- finish sand and oil sink area butcherblock
- box around cabinet legs with bamboo flooring (Richie says the inspector will want this)
- recut removable back panel for water-meter cabinet because I messed it up. This one is tricky.
- install final window trim piece above sink (need window-shelf done first)
- re-glaze, prime, and paint windows
- strip (partially done), prime, and paint doors
- install guide rails on window jambs and reinstall windows
- putty, sand, caulk, prime, and paint all trim molding
- touch up the wall paint here and there because of general carelessness.
- assemble cabinet drawers
- install cabinet shelves, and doors (only 1 cabinet left to go!)
- install drawer pulls on remaining cabinets
- caulk, and seal/waterproof thresholds

Dining room:
- re-glaze, prime, and paint windows
- install guide rails on window jambs
- putty, sand, prime and paint all trim moldings

Basically we haven't touched the diningroom because it has been used as storage/work space for the kitchen appliances and cabinets. Once the cabinets are completely out of the way I'm finished using it as my wood shop, we can really get down to business.

Bed room:
- re-glaze, prime, and repaint window sashes (partially done)

Labels: , , , , , ,

0 Comments:

Post a Comment

<< Home