Mr. Mick close-up
Well the renovation work lately has been very slow and boring so I'm posting a cute (if blurry) picture of Mick doing his thing, chillin on the sofa arm.
Labels: kitty
Labels: kitty
After a full weekend of hanging drywall, we're almost finished with the 2 front rooms. All that's left is 4 pieces in the kitchen. Once that is finished, we'll start doing the joint compound.
Labels: diningroom, drywall, kitchen, renovation
Last night, Paul and I got one sheet of drywall up and then decided halfway through positioning the second sheet that it was really a 3 person job. My brother was kind enough to come over and lend both his hands. Hopefully he doesn't have a concussion from when the drywall hit him on the forehead. Also, no matter how careful you are with these things, you will measure wrong (even twice!) and you will get smutz in your eyes. In fact the exhaust from the drill will blow it there at high speeds.
Labels: diningroom, drywall, kitchen, renovation
Labels: insulation, kitchen, renovation
I registered for my first class at UML today! I was so giddy, going to the registrar, going to check out the building and the math department. I'm taking Real Analysis.
Labels: insulation, math, renovation, school
Labels: diningroom, drywall, renovation
Labels: motorcycle
I have since finished the second sock and presented them to my sis-in-law who loves them :) I tried to keep it on the down low that they were for her so that she would be surprised. And she was (or at least pretended to be). So I had all this microspun leftover and couldn't decide on what my next project should be so I started a pair of mini socks for the String Bean. Here's a picture of how far I got during our little weekend trip to Cleaveland, Ohio. We went to Bruce's Wedding. I wish I had pics but Paul forgot the camera ;-)